Soft watercolour painting of a holiday table setting with warm candlelight, sprigs of evergreen, and dishes in rich ochre and cream tones

Chris Mapp · Eastern Shore

Long-running personal blog from Chris Mapp: snack-food tastings, retro action figures, building blocks, fishing on the Chesapeake Bay, and the occasional pop-culture reflection.

♥ Likes 💬 Comments ↗ Share

We got a wedding gun.

A long-standing interest in firearms resurfaces with a new piece from a family wedding, alongside reflections on collecting in the author's twenties and thirties.

Soft watercolour still life of small mechanical parts in muted blues and warm ochre

Enter, THE ZULLBEAST!

A new addition to the collection from January 2016, documented with the usual mix of photography and childhood-toy nostalgia.

Soft watercolour abstract in pale lavender and cream suggesting a curious figurine silhouette

Stunt Zombie's Christmas Fallout 2015!

Holiday recap from December 2015 covering Christmas gifts, Star Wars Episode VII chatter, and the Town of Exmore Christmas Parade.

Soft watercolour painting of a warm holiday scene in cream and amber tones

I'm Gonna Git You Zuckuss!

July 2013 entry on a bounty hunter figure acquired via trade with LeAnn of Retro Toy Safari, as the Star Wars Power of the Force 2 collection grows.

Soft watercolour abstract suggesting a small action figure in deep violet and ochre washes

Fun Food Friday — Froot Loops Treasures

August 2013 tasting notes on a childhood favourite cereal, plus reflections on how many cereals have changed over the years.

Soft watercolour still life of a breakfast bowl in pastel pinks, greens, and cream

League Assignment — Summer Vacation

A June 2013 League of Extraordinary Bloggers prompt on summer memories, fishing on the Chesapeake Bay, and learning the water from a 16-foot wooden scow.

Soft watercolour seascape in muted teal, sand, and warm amber tones evoking a quiet bay
See all →

How to properly size an oil reservoir for centralised lubrication

Getting the oil reservoir right for a centralised lubrication system is not about choosing the largest tank available. The correct size depends on actual lubricant consumption, pump output, operating temperature and the volume that must remain above the pump suction and minimum operating level. A generous tank without monitoring can conceal leakage, while an undersized tank can cause cavitation, pressure loss and repeated shutdowns.

Accurate sizing starts with the system architecture rather than a rule of thumb. A recirculating oil system returns most lubricant to a sump, so its tank also holds the machine’s internal oil charge. A metered or pressure-feed system consumes measured oil at each bearing or slide. Those arrangements require different calculations, and the operating schedule, oil viscosity and refill interval must be included before tank capacity is chosen.

Start with the lubrication demand

First classify the equipment as recirculating, intermittent metered or open-consumption. Record whether the reservoir is a simple atmospheric sump, a pressurised oil pot or the main vessel in an air-over-oil system. Also identify the lowest permissible level, the pump type and whether the oil returns by gravity.

Create a point-by-point schedule showing each lubrication point’s type, required flow in litres per minute, operating pressure and delivery time. Confirm whether each point uses a conventional nozzle, oil line or micro-lubrication unit. Group identical points only after checking that they can be supplied together without starving another point. Sequential or simultaneous operation changes both the peak flow and the amount consumed per machine cycle.

Use the bearing and OEM figures where available. If data is missing, obtain it from the lubrication-point manufacturer rather than choosing a flow from pipe size alone. A German STEIDLE distributor can also match the correct nozzle, pump and dosing components to the machine, but the selected components still have to be reflected in the reservoir calculation.

Calculate the oil consumed

For an intermittent system, calculate the delivered volume for one complete cycle with Vcycle = Σ(qi × ti), where each flow qi is in L/min and its delivery time ti is in minutes. If several points run simultaneously, use their actual combined operating time. Add a measured allowance for distributor over-delivery or internal leakage, based on test data where possible.

Do not treat circulating pump output as oil consumption. In a closed recirculating loop, the pump sends oil through the bearings and the oil returns to the reservoir; only leakage, oil carried out by shafts, evaporation, filter retention and other genuine losses must be replaced. An open system consumes each metered dose, so its cycle volume is the amount that must be replenished.

Convert the verified cycle loss into hourly, daily and interval totals. Compare the largest demand with the amount available during the shortest practical refill period. Also calculate the peak simultaneous flow needed to establish pressure at the most restrictive point, since adequate storage does not correct an undersized pump.

Set make-up flow and reserve

Choose a refill interval that suits the machine’s operating rhythm and the site’s monitoring capability. The required make-up flow is the calculated loss divided by the available refill time. Keep the pump’s delivery rate above that make-up requirement, while checking that its pressure rating covers the highest line pressure plus friction losses.

Where an air-driven pump supplies the oil, its cycling rate, air consumption and receiver size should be checked as one system. A practical pneumatic pump sizing guide explains why pump selection must match continuous operating hours and pressure demand rather than reservoir volume alone. A pump capable of moving the required oil through the filter at working temperature remains essential in humid or dusty installations.

The reserve is working capacity for leakage, temperature expansion, settling and incomplete returns, not spare capacity for indefinitely extending an unattended system. Keep the liquid level above the manufacturer’s minimum, allow for thermal expansion, and provide a controlled service reserve based on refill access and monitoring. Do not use a generic percentage when the equipment supplier specifies a narrower operating band.

Size the usable tank volume

Calculate usable volume from the tank’s actual dimensions rather than its catalogue label. For a rectangular tank, multiply internal length by internal width by oil depth, then subtract the volume occupied by the pump, baffles, strainers and other immersed parts. Irregular shapes, large pipe entrances and poorly positioned suction pipes can create dead zones that reduce effective capacity.

For a recirculating system, add the oil held in the pump, pipes, manifolds, distributors, bearings, filter and cooler to the minimum sump volume. Confirm that this total charge remains below the tank’s usable capacity at the highest permitted oil level. Pressure-feed systems need enough stored volume for the largest metered cycle plus the calculated reserve.

Specify the tank material, outlet position, internal baffles, vent or breather, drain arrangement and access for cleaning. The outlet must prevent large sediment particles from reaching the pump, while the breather should exclude dust without restricting oil expansion. Confirm compatibility with the oil, seals and any pressure-rated air-over-oil components.

Match the pump and control system

Select a positive-displacement pump that can deliver the required make-up or circulation flow at the lowest expected working temperature. Check viscosity limits because cold oil increases pressure, while worn clearances can reduce actual flow. For rotating-screw or gear pumps, confirm shaft speed, rotation direction, pressure rating and motor sizing against the pump curve rather than nominal displacement alone.

Install controls that make the calculated reserve observable. Suitable combinations include a visible sight gauge, a dry or low-level switch, a high-level alarm, a pressure switch and an automatic pump-stop function. A sight gauge alone is easy to overlook, so position it where operators check it during routine rounds and connect low-level protection to the machine’s control system.

Fit the installation to Australian conditions

Australian factories in Melbourne, Brisbane, Sydney and Perth operate on widely different schedules and ambient conditions. A plant with continuous food-processing shifts needs a different monitoring and refill plan from a workshop that runs pumps only during weekday production. Dust, coastal salt, summer heat and overnight temperature drops also affect breather selection, pump viscosity limits and the rate at which condensation reaches the oil.

Imported German equipment adds another local consideration: parts may need to be ordered overseas and arrive after a long freight journey. Australian maintenance teams commonly protect uptime by holding critical pump, nozzle, hose and filter items locally. A useful essential maintenance spares guide can help identify the components most likely to interrupt lubrication rather than waiting for a shipment to clear customs.

Storage and work practices must comply with the applicable Safe Work Australia model WHS laws and the relevant state or territory regulator. Follow the oil’s safety data sheet, maintain GHS-compliant labels, isolate the system before maintenance and keep spill kits and suitable containment available. Used oil and oily rags are regulated under state environmental rules, so arrange disposal through an authorised contractor and follow site requirements for bunded storage.

Validate and commission the system

Before ordering, ask the lubricant supplier and pump manufacturer to review the calculation. For a recirculating system, send the internal pipe and component inventory, return arrangement, minimum sump level and temperature range. For a metered system, send the duty cycle, delivery times, leakage allowance, refill interval and required reserve. This lets the Shenzhen office confirm compatibility, pricing and availability for the proposed imported STEIDLE package.

After installation, fill the reservoir to the marked operating level, bleed trapped air and confirm pump rotation, pressure, flow and low-level shutdown. Record actual oil use over several representative shifts and compare it with the calculated loss. Inspect filters and the sight gauge during routine maintenance, then update the estimate if production hours, bearing loads or operating temperatures change.


Prepare a one-page duty cycle, list of lubrication points, working temperature and required refill interval, then send it to the Shenzhen office for a reservoir sizing check. The team can coordinate the tank, pump, nozzles, hoses, oil and spare parts needed for a reliable centralised system, with pricing and availability confirmed before shipment.

Toys & Collectibles

Star Wars Power of the Force 2 figures, Lego and knockoff building block reviews, and trades with fellow collectors.

Read toy posts →

Fun Food Friday

Weekly snack food and restaurant spotlights, from Hostess Fruit Pies to Froot Loops Treasures and beyond.

Read food posts →

Life & Hobbies

Summer vacations, fishing on the Chesapeake Bay, local community events, and other personal reflections.

Read life posts →