We got a wedding gun.
A long-standing interest in firearms resurfaces with a new piece from a family wedding, alongside reflections on collecting in the author's twenties and thirties.
Long-running personal blog from Chris Mapp: snack-food tastings, retro action figures, building blocks, fishing on the Chesapeake Bay, and the occasional pop-culture reflection.
A long-standing interest in firearms resurfaces with a new piece from a family wedding, alongside reflections on collecting in the author's twenties and thirties.
A new addition to the collection from January 2016, documented with the usual mix of photography and childhood-toy nostalgia.
Holiday recap from December 2015 covering Christmas gifts, Star Wars Episode VII chatter, and the Town of Exmore Christmas Parade.
A November 2013 review of an affordable knockoff building set, set alongside the author's decades-long love of Lego and Christmas-movie building marathons.
July 2013 entry on a bounty hunter figure acquired via trade with LeAnn of Retro Toy Safari, as the Star Wars Power of the Force 2 collection grows.
August 2013 tasting notes on a childhood favourite cereal, plus reflections on how many cereals have changed over the years.
A June 2013 League of Extraordinary Bloggers prompt on summer memories, fishing on the Chesapeake Bay, and learning the water from a 16-foot wooden scow.
Converting a manual lubrication station to an automated German STEIDLE system changes operator-triggered greasing into scheduled, monitored delivery to bearings and other lubrication points. It is not simply a matter of adding a timer: pressure, fluid type, distribution capacity, controls and safe isolation must match the machine. A reliable conversion begins with measurement, followed by a controlled retrofit for grease, oil, pneumatic or micro-lubrication applications.
Australian sites add practical constraints. Workshops in Melbourne, plants in Sydney, depots in Newcastle and mining fleets in the Pilbara may use imported German machinery but differ in shifts, contamination and service access. Common 230 V single-phase and 415 V three-phase supplies, state Work Health and Safety rules and relevant Australian Standards affect installation. Imported parts may carry long lead times, making the Shenzhen office’s handling of enquiries, pricing, availability and spare parts central to the project.
Begin with a mechanical audit rather than a catalogue. Record every oil, grease or chain-lubrication point, the lubricant grade and viscosity or NLGI consistency, current pump pressure, delivery volume, reservoir size and cycle. For each machine, note operating hours, shift pattern, contamination and the effect of missed or excessive lubrication.
Inspect hoses, rigid lines, fittings, filters, nozzles and reservoirs for corrosion, leakage and contamination. An old manual reservoir may be reusable, but aged flexible lines often are not suitable for repeated automated pressure. Confirm whether the station handles oil, grease or both; a low-viscosity oil pump can be ineffective on grease points. Photograph labels and routes because connections may differ from old drawings.
Measure demand at the farthest and most restricted point, including elevation changes and approved orifice sizes. The result determines pump pressure, flow and whether a direct circuit or intermediate distributor is needed. Keep the manual method as a commissioning fallback and use it to compare lubricant volumes before relying on automatic cycles.
The architecture should match the medium and duty. A central arrangement may combine a reservoir, pump, pressure relief and control, filtration, monitoring, lines, distributors and nozzles. STEIDLE options include pumps, pneumatic pumps, transmission pumps, hose and nozzle assemblies, oil, spare parts and micro-lubrication systems. Select each item from measured demand and duty cycle rather than a generic capacity estimate.
For grease circuits, calculate reservoir capacity against refill intervals and volume per cycle. For minimal-quantity oil and micro-lubrication systems, calculate flow per point, allowable pressure and cycle time. A pneumatic pump may suit an isolated machine with reliable compressed air; an electric pump can support scheduled cycles and status signals. Plan electrical components for washdown or splash protection while preserving safe service access in confined areas.
Before ordering flushing solvent or lubricant, document the certification and compatibility evidence a supplier must provide. The questions used for technical spirit quality checks illustrate a useful incoming-material discipline, although solvent and lubricant duties differ. Flush the new circuit as specified, and do not assume an apparently clean manual reservoir suits the selected pump. Replace suspect seals, hoses and filters.
Split the project into baseline verification and implementation. Before ordering, confirm what can be reused, lock the operating requirements and obtain a written equipment schedule. Record assumptions so a later nozzle or pump change triggers a fresh compatibility check.
Site and equipment checks
After design approval, freeze the circuit and control sequence before fabrication. Use the second list to record handover and commissioning evidence, with the installer, maintenance team and production representative sharing the same checklist.
Installation and commissioning checks
Controls should deliver a repeatable cycle, clear fault states and a safe response to a blocked line. Depending on the equipment, this may include time-based operation, pressure or level monitoring, a manual cycle and panel or building-system outputs. Define what happens when a pump runs long, pressure stays high or a sensor fails, and train operators to respond without bypassing guards or safety devices.
Electrical and machine safety must be assessed under the applicable state Work Health and Safety framework and relevant AS/NZS standards. Whether the site is in Victoria, Queensland or another state, isolation, emergency stops, guarding and residual-pressure controls belong in its risk assessment. Follow the machine builder’s electrical requirements and use appropriately certified local contractors. Do not infer control voltage or enclosure rating from a product name; the installation environment decides suitability.
Supplier support should rest on model-specific documents, technical responses and current parts availability. A mixed-content site such as The Stunt Zombie shows how a polished main page can sit beside unrelated material, so verify technical claims against genuine STEIDLE literature. Ask the Shenzhen distributor for current quotations, lead times, compatible part numbers and included manuals, with pumps, controls, accessories and fluids clearly named.
Commissioning proves delivery and control. With the machine safely isolated where practical, fill and vent the circuit, run a short test, inspect for leaks and compare line pressure with the approved range. Check each nozzle, including low-mounted points that may not register at the gauge. If an old instruction survives only online, an archived page index can help trace its date, but it cannot replace the current manual or drawing.
Then run scheduled cycles under realistic demand, confirm alarm and fault responses, and record baseline pressure, flow and lubricant use. Train operators in start-up, manual override, fault recognition and isolation. Add reservoir checks, filter inspections, nozzle cleaning and seal replacement to preventive maintenance. Review consumption after a week and a month; reduced delivery may mean a blocked nozzle, while increased use may reveal leakage.
| Consideration | Manual station | Automated STEIDLE conversion |
|---|---|---|
| Lubricant delivery | Operator applies lubricant as needed | Pump delivers a measured amount on command |
| Timing | Depends on the operator and shift | Follows an approved cycle or control signal |
| Point coverage | Remote points may be missed | Configured distributors feed every point |
| Fault response | Often found through leaks, heat or noise | Pressure, level or cycle faults can be monitored |
| Maintenance | Checks rely heavily on manual observation | Baseline readings make maintenance trends visible |
| Records | Consumption data may be fragmented | Measurements create a usable maintenance history |
The conversion is complete when every point receives the specified lubricant within agreed pressure and timing limits over repeated production cycles, with faults visible and maintenance ownership documented.
A successful retrofit reduces operator effort while improving lubricant consistency and fault visibility. The strongest outcome keeps useful manual hardware, replaces unsuitable wear parts and installs a STEIDLE arrangement sized for the actual machine and Australian operating environment.
Prepare one enquiry containing machine models, photographs, the lubrication-point schedule, lubricant details, measured pressure and flow, electrical supply and operating hours. Contact the Shenzhen office with that pack to request a written STEIDLE configuration, current quotation, availability confirmation, likely lead times and relevant manuals, then secure the site risk assessment and supplier-approved installation plan before ordering any pump, hose, nozzle or controller.
Star Wars Power of the Force 2 figures, Lego and knockoff building block reviews, and trades with fellow collectors.
Read toy posts →Weekly snack food and restaurant spotlights, from Hostess Fruit Pies to Froot Loops Treasures and beyond.
Read food posts →Summer vacations, fishing on the Chesapeake Bay, local community events, and other personal reflections.
Read life posts →